Construction of San Diego's sewage recycling system on track, but still facing challenges

Pure Water construction at a recycling facility in San Diego. (Ana Ramirez/The San Diego Union-Tribune). Problems include flooding at the Morena pump …

Do you trust this headline?

Based on recent headline ratings, 85% of this readership currently trusts the local media, which has an average score of 83% regionally and is currently trending positive.

85%

Media Trust Score85%